欧美久久外国网站日韩国产免费一区二区三区_日本又黄又爽又无遮挡的视频_一级片a_人妻体内射精一区二区_狠狠久久亚洲欧美专,亚洲乱码爆乳精品成人毛片亚洲乱码中文字幕久久孕妇黑人_99久久国产精品免费少妇无码一区二区二三区_成人乱码一区二区三区AV66国内精品宾馆在线精品酒店_国产精品久久久久久妇女国产女爽爽精品视频天美传媒 ,欧美日韩人妻精品一区二区三区_一区二区免费国产在线观看_一区二区日韩国产精品_日韩一区二区三区免费播放_国产午夜无码专区喷水_一区二区欧美日韩高清免费_无毒不卡在线观看无需下载_完整观看高清秒播国内外精品资源_国产精品福利在线观看免费不卡_一本清道av高清在线看_国产AⅤ精品一区二区三区久久_亚洲国产天堂久久久_亚洲色噜噜噜噜噜噜国产 ,国产精品日韩一区二区三区_精品国产不卡自在自线_欧美第一页在线观看_影音先锋2024色资源网_中文字幕人妻少妇引诱隔壁_亚洲综合另类小说色六月_国产91在线午夜激情经典_一级毛片免费不卡夜夜欢_中文字幕无码精品亚洲35_亚洲制服丝袜自拍中文字幕

Welcome to the official website of Wuxi Huake Machinery Equipment Co., Ltd.!
導(dǎo)航
Hotline:86-510-88782152
×
What Is The Process Of Electric Basket In Construction
作者:Admin 閱讀:1564
1、 After The Electric Basket Is Transported To The Construction Site, All Components To Be Installed Shall Be Inspected And Checked. 2、 Install The Roof Suspension Device In A Flat And Protected Place. The Number Of Counterweights Will Then Be Determined. Fix The Counterweight On The Counterweight Frame. 3、 After Installing The Roof Support, Install The Basket Body Of The Electric Basket At The Corresponding Ground Position. After The Installation, Check Whether The Parts In Each Place Are Installed Properly And Whether The Bolts Are Loose. 4、 Fix The Safety Rope To The Fixed Point In The House, And Then Put It Down Along The Wall. An Electric Basket Must Have A Safety Rope To Ensure The Safety In The Construction Process. 5、 After Installation And Play, Connect The Power Supply For Trial Operation. At Runtime, Run At Least Three To Five Times To Ensure Safe Use. After Being Qualified, We Can Arrange The Acceptance Of The Electric Basket. 6、 After The Equipment Acceptance, The Construction Party And The Acceptance Party Need To Sign An Acceptance Certificate Before The Electric Basket Can Be Delivered To The Construction Party For Use. 7、 During The Construction, It Should Be Noted That After The Construction Of The Floors Below The 18th Floor, The Basket Body Of The Basket Needs To Be Lowered To The Ground. Then Remove The Safety Rope And Bracket, And Start The Installation From The New Installation Site. Then Lift The Basket. When The Basket Is Not On The Ground, It Is Forbidden To Move Its Position. If It Must Move, The Power Must Be Cut Off First. So As To Avoid Accidents Caused By Operational Errors. 8、 After The Completion Of Construction, Inform The Construction Party And The Acceptance Party To Check Whether The Equipment Is Damaged Or Lost. If They Do Not Sign On The Exit Sheet, They Can Arrange The Exit Of The Electric Basket.
Home
Company
Honor
Partner
Case
Video
News
Company information
Industry dynamic
Q&A
Products
Construction hoist
Material elevator
Construction lifting platform
Suspended platform
Contact
Contact
Feedback
Wuxi Huake Machine Equipment Co., Ltd
Add:No. 120 jiaoyang road, yangjian industrial park, xishan district, wuxi
Code: 214107
E-mail:sales@china-tdt.com
Sales department:tel: 86-510-88782152
桑植县| 景泰县| 凤阳县| 北票市| 绥滨县| 那曲县| 马山县| 丰台区| 巢湖市| 东明县| 祁东县| 龙井市| 抚州市| 德兴市| 唐河县| 崇阳县| 公主岭市| 玛多县| 襄汾县| 平利县| 华坪县| 红桥区| 民乐县| 涟水县| 马公市| 上栗县| 景宁| 永胜县| 凤凰县| 东莞市| 雷山县| 邵东县| 铁岭市| 呼伦贝尔市| 富阳市| 牙克石市| 平凉市| 鄂托克前旗| 崇仁县| 苗栗县| 肥乡县|