欧美久久外国网站日韩国产免费一区二区三区_日本又黄又爽又无遮挡的视频_一级片a_人妻体内射精一区二区_狠狠久久亚洲欧美专,亚洲乱码爆乳精品成人毛片亚洲乱码中文字幕久久孕妇黑人_99久久国产精品免费少妇无码一区二区二三区_成人乱码一区二区三区AV66国内精品宾馆在线精品酒店_国产精品久久久久久妇女国产女爽爽精品视频天美传媒 ,欧美日韩人妻精品一区二区三区_一区二区免费国产在线观看_一区二区日韩国产精品_日韩一区二区三区免费播放_国产午夜无码专区喷水_一区二区欧美日韩高清免费_无毒不卡在线观看无需下载_完整观看高清秒播国内外精品资源_国产精品福利在线观看免费不卡_一本清道av高清在线看_国产AⅤ精品一区二区三区久久_亚洲国产天堂久久久_亚洲色噜噜噜噜噜噜国产 ,国产精品日韩一区二区三区_精品国产不卡自在自线_欧美第一页在线观看_影音先锋2024色资源网_中文字幕人妻少妇引诱隔壁_亚洲综合另类小说色六月_国产91在线午夜激情经典_一级毛片免费不卡夜夜欢_中文字幕无码精品亚洲35_亚洲制服丝袜自拍中文字幕

Welcome to the official website of Wuxi Huake Machinery Equipment Co., Ltd.!
導航
Hotline:86-510-88782152
×
Working Process And Design Requirements Of High Altitude Work Basket
作者:Admin 閱讀:2506
During The Working Process Of The High-altitude Work Basket, When It Bears Its Rated Load, Its Hoist Shall Work Normally For 3000 Cycles, The Working Time Before Failure Shall Not Be Less Than 0.5t0 (cumulative Working Time), The Average Working Time Without Failure Shall Not Be Less Than 0.3t0, And The Reliability Shall Not Be Less Than 92%. When The Manual Lifting Basket Bears The Rated Load, The Hoist Shall Be Able To Work Normally For 500 Cycles. There Should Be No Fracture And Obvious Wear. When The Elevator Changes Its Running Direction, The Brake Should Work. The Structure Of The Platform Should Be Able To Bear 2 Times Of The Uniformly Distributed Rated Load. Before Leaving The Factory, Load Test Must Be Done Well, And Check Whether The Weld Is Cracked And The Bolt Is Loose. The Welds Of The Main Stressed Components Of The Platform Must Be Inspected To Ensure That The Welds Meet The Design Requirements. The Bottom Plate Of The Basket Platform For Aerial Work Must Be Provided With Anti-skid Measures. During The Operation, The Connection Of Its Lifting Mechanism Must Be Firm And Reliable, Without Any Looseness, And Should Be Checked Frequently. The Hanging Basket Platform Shall Be Equipped With A Hook Device For Safety Belt And Tools. The Width Of The Small Passage In The Basket Platform Shall Not Be Less Than 400mm, And The Effective Area Of The Bottom Plate Shall Not Be Less Than 0.25m2 Per Person. The Platform Of High-altitude Work Basket Shall Be Equipped With Fixed Safety Guardrail, The Height Of One Side Near The Building Shall Not Be Less Than 800mm, The Height Of The Back Side And Both Sides Shall Not Be Less Than 1100mm, And The Guardrail Shall Be Able To Bear The Concentrated Load Of 1000N Horizontal Movement. All Components Of The Safety Guardrail Of The Basket Platform Shall Be Smooth And Free Of Burrs, And Shall Be Free Of Skew, Distortion, Deformation And Other Defects After Installation. A Baffle With A Height Of Not Less Than 100-150 Mm Shall Be Installed Around The Base Plate Of The Platform Of The Basket For High Altitude Operation, And The Gap Between The Baffle And The Base Plate Shall Not Be Greater Than 5 Mm. The Basket Platform Shall Be Equipped With Guide Wheel Or Buffer Device For Sliding On The Building Surface To Ensure The Stability Of The Basket Platform, So As To Avoid Impact With The Wall.
Home
Company
Honor
Partner
Case
Video
News
Company information
Industry dynamic
Q&A
Products
Construction hoist
Material elevator
Construction lifting platform
Suspended platform
Contact
Contact
Feedback
Wuxi Huake Machine Equipment Co., Ltd
Add:No. 120 jiaoyang road, yangjian industrial park, xishan district, wuxi
Code: 214107
E-mail:sales@china-tdt.com
Sales department:tel: 86-510-88782152
阳谷县| 盐源县| 确山县| 新巴尔虎右旗| 海城市| 应用必备| 乌拉特中旗| 大兴区| 美姑县| 晋宁县| 北辰区| 临汾市| 辽宁省| 蓬莱市| 新闻| 曲阜市| 大渡口区| 辛集市| 浮山县| 区。| 雷山县| 台中县| 莱阳市| 宁波市| 云霄县| 彭山县| 克东县| 英山县| 资源县| 大埔区| 宜兰市| 凌海市| 买车| 兴国县| 大丰市| 阿坝县| 托克逊县| 南岸区| 平乡县| 清水河县| 涿鹿县|